System engineering and management plan (SEMP)
March 22nd, 2022
Deliverable Length: 5-7 Pages + cover and reference
In this task, you will develop a detailed outline of the system engineering and management plan (SEMP) for an fully autonomous UAV/UAS system. Complete the following:
- Use book as a reference, and study the systems engineering management plan.
- Your outline should follow the format and include the 7 steps of that plan.
- The plan should be based on the system that your used for your ORD and TEMP.
- Be sure to cite all references in APA format.