automatic teller machine
May 20th, 2022
part of the project and here are the outlines: I also uploaded a sample project for guidance
- Abstract
- Introduction ( included the AV-1)
- Operational Node Connectivity ( OV-2)
- System Requirements
- OV-5/IDEF0
- System Architecture
- Physical Architecture
- Verification and Validation
- Risk Management
- Conclusion