Unit III Project
April 14th, 2022
As a continuation of our course project due in Unit VIII (a proposal for an industrial and hazardous waste treatment facility), complete the next (fourth) section (chemical treatment) of your proposal by following the instructions carefully, and then submit your continued draft of your proposal into Blackboard for grading.
Instructions:
- Closely read the Required Reading assignment from Bahadori (2014) and the Unit Lesson within the Study Guide.
- Open your proposal draft from Unit II and make any improvements to your draft using your professor’s feedback from the Unit II project assignment.
- Open the Unit III Study Guide, read the unit lesson, and then work with the embedded interactive model to decide what chemical treatment equipment to include in your treatment process design.
- Continue from your Unit II Project and make your fourth level one heading titled “Chemical Treatment.” Describe the chemical treatment equipment that you engineered into your treatment process. Be sure and describe the relevance and anticipated reduction of related analytical concentrations within your industrial and hazardous waste treatment system as they correspond with each technology that you selected.
You are required to describe the equipment selection in at least 200 words (minimum).